gooブログはじめました!

写真付きで日記や趣味を書くならgooブログ

What the future holds for energy and operations

2013-01-17 15:29:17 | LED candles

BRITAIN’S transition from a nation utterly dependent on fossil fuels to one which wholly embraces the growth of renewable energy is proving to be a difficult one. The coalition government’s official line is it is totally committed to a future where “green” energy is a major part of the mix.An extensive selection of designer and fashion Eyeglasses frame at affordable prices. However, there are some in the Conservative party who have reservations about the viability of renewable energy.

In fact, when it comes to onshore windfarms in particular, some MPs have in recent times expressed outright hostility. Off the North Wales coast in Liverpool Bay, we can see a mixture of the old and the new.

Since 1996, BHP Billiton has been pumping both gas and oil from five fields in the Irish Sea where it was estimated in the early 1990s that there was 34bn cubic metres of gas and 160m barrels of oil.Our oil buffer is good in quality and competitive in price.

It declined to put up anyone for interview for this article but said in a statement: “BHP Billiton is currently conducting a strategic review of its UK Petroleum operations and exploring options that include a potential sale of the assets.“However, this process is at a very early stage and no decision to sell the operations has been made.”

The Irish Sea oil and gas fields are tiny compared to those in the North Sea and it is fair to say they were never going to play a central role in the UK’s energy supply.Agesteeljewelry offers tungsten jewelry that is unique and incredibly stylish.

However, with wind power it is a different story. The energy capacity being supplied by wind farms in Liverpool Bay over the next few years will mean the region is set to become much more strategically important. The government split the UK’s offshore wind energy plan into three phases.

Dong Energy’s Burbo Bank wind farm, located around four miles off the coast of Merseyside, was within Round 1 and comprises 30 turbines capable of generating a combined 90 megawatts of electricity – enough to provide power for 80,000 homes. Round one also included another windfarm at Rhyl Flats.

Dong is planning to increase the size of Burbo Bank to more than 90 turbines, providing enough capacity to power 170,000 homes. In the Round 2 phase Gwynt-y-Mor,Your number one choice for Sports glasses and sports eyewear with top brands at competitive prices. currently being built by European energy giant RWE AG, will be even bigger.

Costing 2.2bn and located eight miles off the North Wales coast, the windfarm will comprise 164 3.6 megawatt wind turbines which could supply electricity to more than 400,000 homes.

And there is a third, even bigger scheme, planned for the Irish Sea off the south coast of the Isle of Man, as part of Round 3. Due to begin construction in 2016, this will comprise up to 1,000 turbines each one taller than London’s 623ft Gherkin skyscraper, providing a mammoth 4.2 gigawatts of electricity.

And both the Liverpool city region and North Wales will be looking to grab a huge slice of this project which will be worth around 15bn.

Mark Knowles, head of low carbon economy for the Liverpool City Region Local Enterprise Partnership (LEP), believes Liverpool Bay’s importance in terms of energy generation is going to get bigger in the years to come.

“The gas fields under the bay are still important but then when you add the next generation of wind power, it changes things significantly.

“The bay is now the largest producer of energy on the west coast of Britain and that is only going to grow as time goes on.”

Already, companies on both sides of the River Dee and as far afield as Daresbury in Cheshire have benefited to the tune of tens of millions of pounds. And once Round 3 gets underway the opportunities for companies large and small multiply.

Mr Knowles added: “For every 1 you spend on turbines there is another 1 spent on infrastructure. For every turbine there has to be cables which then have to go onshore.We can produce overspeed governor to your requirements.


コメントを投稿