Small construction waste crusher is one of the most commonly used equipment in mining, but there are a lot of small construction waste crusher installation details easy to overlook, such as the installation of the pad iron, the use of a general plasma method.

Because the construction waste crusher belongs to the high speed vibration machine, its foundation should be separated from other foundation or the isolation measure of vibration source. Before installation, the base of the foundation is found to be different and steep. If the gasket is placed directly on this basis, the water level requirement of the gasket cannot be guaranteed, and the contact area requirement of the underside of the cushion is not reached. Even if the base level is bulldozed, the level is guaranteed, but it is difficult to operate on the same level with the base of 32 pay pads. And bottom, with the base plate surface contact area is lesser, equipment in the above work for some time, its elevation and level must be changed, worsen the running state of the equipment of large rotating equipment installation is strict with mat iron, the work quality, directly affects the service life of equipment and the vibration of the equipment after the rotation, and even the small construction waste crusher in the problems in production in the future will also increase. Therefore, the installation quality of the installation is a crucial part of the installation quality.

Through consulting relevant data and construction drawings, and technical personnel and engineering supervisor to discuss, negotiate, decided to take the plate a slurry method embedded motherboard, installed with no shrinkage grouting material pouring between foundation and equipment. Slurry method - simply put the concrete mortar between the base and the iron base, to achieve the purpose of mounting iron, and improve the installation quality of the cushion.

When the slurry is used, the level of the bottom plate is measured with a level meter, and the elevation of each floor is measured with a water level instrument to ensure the same elevation of each floor. This will also reduce the number of gaskets, using only a base plate and a slant pad. The mortar is made of sand, gravel, cement and water. The mixing ratio is an important part of the construction of the slurry method. The quality of the mixing ratio directly affects the construction quality of the slurry method, and the cement of the slurry method is used without shrinkage cement and high grade cement.