NO.1 Which of the following statements describing the consequences of specifying test conditions
at a detailed level is NOT true?
K2 1 credit
A. For system testing, the specification of test conditions at a detailed level, carried out early in the
project as soon as the test basis is established, can contribute to defect prevention
B. In an environment where the test basis is continuously changing, it is recommended to specify
test conditions at a detailed level in order to achieve a better maintainability
C. The specification of test conditions at a detailed level can be effective when no formal
requirements or other development work products are available
D. The specification of test conditions at a detailed level can require the implementation of an
adequate level of formality across the team
Answer: B

CTAL-TM_Syll2012 デモ   

NO.2 You are the Test Manager for a project to develop a client-server application that allows wine
vendors to order custom-assorted packages of wines of several winemakers to sell special packages
in their wine shops.
You decide to apply a blended risk-based and reactive testing strategy. Below the exit criteria for the
system testinG.
EXCR1- Each "critical" quality risk item must be covered by at least one test condition
EXCR2- Each "critical" requirement must be covered by at least one test condition
The following are the "critical" requirements of the application:
REQ-SEL-1. The application shall allow the user to order only one package at a time
REQ-SEL-2. The application shall allow the user to select between four different packages (2bottles,
6-bottles, 12-bottles, 15-bottles)
REQ-SEL-3. The application shall allow the user to order a package containing at least 1 bottle and
no more bottles than the package size. No error messages shall be displayed if the user selects a
valid number of bottles (at least 1 bottle and no more than the package size)
REQ-SEL-4. The application shall display an error message "Invalid number of bottles" if an invalid
number of bottles is selected by the user (zero bottles or a number higher than the package size)
REQ-PAY-1. The application shall allow the user to pay with the three accepted credit cards (Visa,
MasterCard, American Express)
REQ-PAY-2. The application shall display an error message "Invalid credit card" if invalid credit card
data are given by the user
The following is the unique "critical" quality risk item that has been identified:
CR-RSK-1. The GUI of the application might accept non-integer values for the input field designed to
get the number of bottles from the user Test analysis for system testing has just begun and the
following test conditions have been identified.
TC-SEL-2. Test the selection of the package sizes
TC-SEL-4. Test wrong numbers of bottles for an order
TC-CR-RSK-1. Test the accepted values from the input field designed to get the number of bottles
from the user
What is the MINIMUM number of test conditions that must be added to fulfill both the EXCR1 and
EXCR2 exit criteria?
K3 2 credits
A. 2
B. 1
C. 3
D. 4
Answer: D

NO.3 The following are the exit criteria described in the test plan of a software product:
EX1. The test suite for the product must ensure that at least each quality risk item is covered by at
least one test case (a quality risk item can be covered by more test cases).
EX2. All test cases in the test suite must be run during the execution phase.
EX3. Defects are classified into two categories: "C" (critical defect) and "NC" (non-critical defect). No
known C defects shall exist in the product at the end of the test execution phase.
Which of the following information is useless when the specified exit criteria is evaluated?
K2 1 credit
A. A list of all the open defects with the associated classification information extracted from the
defect tracking system
B. A traceability matrix showing the relationships between the product risk items and the test cases
C. A chart, showing the trend in the lag time from defect reporting to resolution, extracted from the
defect tracking system
D. The execution status of all the test cases extracted from the test management tool
Answer: C

CTAL-TM_Syll2012 ブロンズ   

NO.4 Consider an information system of a Pay-Tv company based on a SOA architecture.
The integrated system currently consists of three core systems:
-a CRM (Customer Relationship Management) system
-a BRM (Billing and Revenue Management) system
-a CAS (Conditional Access System) system all of them communicating with SOA Middleware.
You have been asked to manage the testing activities for the integration of two additional
off-theshelf systems from two different vendors: a SMS (Short Message Service) server and an IVR
(Interactive Voice Response) system.
Assume that there is a high likelihood that the two off-the-shelf systems will be low-quality and that
you have a clear proof that the testing performed by the two vendors on their systems has been
unsystematic and unprofessional. This obviously leads to higher quality risk for the overall
integrated system.
You are the Test Manager of this project. Your main goal is to plan for testing activities to mitigate
this risk.
Which of the following answers best describes the test activities (assuming it is possible to perform
all of them) you should plan for?
K4 3 credits
A. You should plan for adequate re-testing of both the systems followed by a system integration test
and an end-to-end test of the overall integrated system
B. You should directly plan for a single end-to-end test focused on end-to-end tests of the overall
integrated system without an acceptance test of the two off-the-shelf systems
C. You should plan for two levels: a system integration test and an end-to-end test of the overall
integrated system
D. You should plan for an informal and minimal acceptance test of the two off-the-shelf systems and
then a single end-to-end test of the overall integrated system
Answer: A


CTAL-TM_Syll2012 合格体験記 はIT業界に認定試験大綱の主要なサプライヤーとして、専門家は一緻して品質の高い商品を開発し続けています。


ISQIのCTAL-TM_Syll2012 合格体験記はIT業界にとても重要な地位があることがみんなが、たやすくその証本をとることはではありません。いまの市場にとてもよい問題集が探すことは難しいです。JapanCertは認定で優秀なIT資料のウエブサイトで、ここでISQI CTAL-TM_Syll2012 合格体験記の先輩の経験と暦年の試験の材料を見つけることができるとともに部分の最新の試験の題目と詳しい回答を無料にダウンロードこともできますよ。


人生にはあまりにも多くの変化および未知の誘惑がありますから、まだ若いときに自分自身のために強固な基盤を築くべきです。あなた準備しましたか。JapanCertのISQIのCTAL-TM_Syll2012 合格体験記は最高のトレーニング資料です。IT職員としてのあなたは切迫感を感じましたか。JapanCertを選んだら、成功への扉を開きます。頑張ってください。


CTAL-TM_Syll2012試験番号:CTAL-TM_Syll2012 学習範囲
試験科目:「ISTQB Certified Tester Advanced Level - Test Manager [Syllabus 2012]」
最近更新時間:2017-05-18
問題と解答:64

>> CTAL-TM_Syll2012 学習範囲


 

JapanCertは最新のCS0-001問題集と高品質の400-151問題と回答を提供します。JapanCertのVCS-322 VCEテストエンジンとE20-526試験ガイドはあなたが一回で試験に合格するのを助けることができます。高品質の300-165 PDFトレーニング教材は、あなたがより迅速かつ簡単に試験に合格することを100%保証します。試験に合格して認証資格を取るのはそのような簡単なことです。


記事のリンク:http://www.japancert.com/CTAL-TM_Syll2012.html

ジャンル:
ウェブログ
コメント   この記事についてブログを書く
この記事をはてなブックマークに追加
« 70-332日本語 無料問題 & 70-... | トップ | もしあなたはまだマイクロソ... »

コメントを投稿


コメント利用規約に同意の上コメント投稿を行ってください。

数字4桁を入力し、投稿ボタンを押してください。

あわせて読む

トラックバック

この記事のトラックバック  Ping-URL
  • 30日以上前の記事に対するトラックバックは受け取らないよう設定されております。
  • 送信元の記事内容が半角英数のみのトラックバックは受け取らないよう設定されております。
  • このブログへのリンクがない記事からのトラックバックは受け取らないよう設定されております。
  • ※ブログ管理者のみ、編集画面で設定の変更が可能です。